Two 2026 decisions that change how Victorian strata should think about balcony leaks
In 2026, VCAT held an upstairs apartment owner liable for water leaking from her balcony into the unit below. She didn't build the balcony or waterproof it. Later that year, the Supreme Court of Victoria decided that, under some subdivision plans, the balcony's tiles, screed and waterproof membrane belong to the owners corporation rather than the lot owner. Together, the decisions show how quickly balcony leaks turn into a question of who pays.
On this page
Decision 1: the upstairs owner who didn't cause the leak
According to Mills Oakley's published summary, the case involved two apartments in a Melbourne high-rise. Water leaked from the upper apartment's balcony into the apartment below shortly after construction. The cause was defective waterproofing by the builder. It was common ground that the flow was unreasonable.
The upstairs owner said she couldn't afford the rectification work, estimated at about $225,000. She pointed to the steps she had taken: helping the lower owner and the owners corporation investigate, investigating herself, suing the builder, and doing some balcony repairs.
Vice President Judge Macnamara found her liable under section 16(5) of the Water Act. That provision can make the current owner of land liable for an unreasonable flow that originates there, even where someone else caused it, if they don't take the steps reasonably available to stop it. As summarised by Mills Oakley, the Tribunal:
- read "any steps reasonably available" as all steps reasonably available, so one or two reasonable steps weren't enough;
- accepted financial circumstances can be relevant, but only in extreme cases where someone is effectively living "hand to mouth". It found that wasn't the case here, after weighing her overall circumstances, including that the apartment was tenanted.
Mills Oakley reads the decision as the strictest possible interpretation of the section. In their view, failing to fix a defect promptly can leave the claim landing on the current owner rather than the original builder.
Decision 2: where the balcony boundary sits
In Victoria, the boundary between a lot and common property comes from notations on the plan of subdivision. The common notations are "exterior face", "median" and "interior face". Since 2014, VCAT decisions had put the interior face of a floor at the top of the concrete slab. On that reading, everything above it, including screed, membrane and tiles, belonged to the lot owner.
In Damjanovski, Justice Harris disagreed. HWL Ebsworth's summary says he held that, for a plan that pre-dated the 2011 subdivision regulations, the interior face sits at the finished floor surface. That puts the screed, membrane and tiles on the common property side. The 2025 VCAT decision was overturned.
Whose layer is it?
- TilesBoundary after Damjanovski (Supreme Court, Oct 2026)
- Screed
- Waterproof membrane
- Concrete slabBoundary in VCAT decisions since 2014
- Boundary after Damjanovski (Supreme Court, Oct 2026)
- Boundary in VCAT decisions since 2014
Applies to pre-2011 plans of subdivision with an "interior face" boundary notation.
What the decision didn't settle:
- Post-2011 plans. The Court didn't need to decide where the interior face sits for later plans. HWL Ebsworth notes the relevant regulation is ambiguous.
- Who pays. Even where a balcony is common property, section 24 of the Owners Corporations Act 2006 lets fees be levied on the benefit principle and, in some cases, on a lot's particular use. Those questions weren't decided and may go back to VCAT.
- Other boundary types. Exterior face and median boundaries aren't affected.
These decisions fit a pattern
Neither decision came out of nowhere. In 2022 The Melburnian reported a VCAT case involving a St Kilda Road building, after about a decade of water-ingress complaints from a fifth-floor lot owner. The owners corporation was ordered to do about $58,000 of works and pay about $60,000 in compensation, lost rent of $775 a week until the works were finished, and about $27,000 in owners corporation fees the owners had paid while living elsewhere. Bad weather, lockdowns and contractor availability weren't accepted as excuses.
Victoria's regulator is targeting the same problem from the construction side. Balcony water ingress was a focus of the Building and Plumbing Commission's targeted inspection campaigns in 2024 and 2025. A scoping study for the regulator, led by Dr Tim Law of Victoria University with the VMIA, looked at 2,178 accepted domestic building insurance claims from July 2018 to November 2020. It found 1,995 (about 92%) involved at least one water-related defect, and identified balconies and internal wet areas as key problem areas. Victoria adopted NCC 2025 from 1 May 2026, including restructured water management provisions for apartment and commercial buildings and new requirements for concrete balconies in apartment buildings.
What this means for owners corporations and managers
Check your plan before you allocate the problem. Pull the plan of subdivision, note its date (before or after 2011) and the boundary notation. After Damjanovski, the long-standing assumption that the "membrane is the owner's problem" may be wrong for some older buildings.
Treat the first leak complaint as the start of a clock. The St Kilda Road case shows what years of inaction cost. Casdaus shows that partial steps may not protect an upstairs owner. Acknowledge complaints quickly, find the source, and record what you did and when.
Separate the source from the damage. A balcony leak usually needs two jobs. One is finding and fixing the waterproofing failure. The other is drying the ceiling, walls and contents below before mould becomes a second claim. Moisture mapping and dated photos taken before anything is removed help both the repair and any later dispute.
Investor owners need to hear about this. Mills Oakley suggests the hardship exception is even narrower for owners who earn income from the property. Committees may want to tell lot owners that a defect left from construction can still become their liability.
Questions for your next committee meeting
- What boundary notation and plan date apply to our balconies?
- Do we have a written process and timeframe for acting on water-ingress complaints?
- When a leak crosses lots, who arranges drying of the affected lot, and who pays while responsibility is sorted out?
- Have any defects from construction been left unrectified while a builder claim runs?
Sources
- AustLIICasdaus Pty Ltd v Nichols [2026] VCAT 483
- Mills Oakley (Ben Patrick and Carolyn Tran)Successor in title liability under section 16(5) of the Water Act 1989 (Vic)21 August 2026
- HWL Ebsworth (Jacomb Bell)Damjanovski: the balcony boundary moves but the floor doesn't fall away12 October 2026Summary of Damjanovski v Owners Corporation 1 Plan No. PS503570D [2026] VSC 656.
- The Melburnian (Tom Bacon)Water ingress claims against OCs set to skyrocket after marathon VCAT case8 June 2022
- Building and Plumbing CommissionOur initiatives to prevent water damage and protect consumers
- Victorian Building AuthorityExamining indoor mould and moisture damage in Victorian residential buildings
- Victorian GovernmentBuilding standards in Victoria: NCC 2025 commencement
- HIANCC 2025 adopted in Victoria 1 May 2026
General information about published decisions. It isn't legal advice. Mould Squad isn't involved in either proceeding.